Introduction:
In the heart of the Davis-Monthan Air Force Base (DMAFB), a remarkable transformation has taken place at Administrative Area A and C of Facility 5251. Spearheaded by the U.S. Army Corps of Engineers (USACE) and executed by Marsh Development, the renovation and sustainment project, which commenced on September 29, 2017, and concluded on December 16, 2022, has breathed new life into the facility. This blog explores the intricate details of this expansive undertaking, showcasing how it has not only revitalized the spaces but also set a standard for comprehensive construction and sustainment.
Project Overview:
The DMAFB AMU Facility 5251 project was an ambitious endeavor encompassing a myriad of renovations and sustainment activities. The scope included:
Complete Interior and Exterior Renovations: The project entailed a comprehensive makeover, involving the demolition of existing walls, construction of new walls, installation of signage throughout the facility, and the replacement of insulation panels. This holistic approach transformed both the interior and exterior of the facility.
Administrative Area A Renovation: Administrative Area A underwent a complete overhaul, leaving only existing exterior walls and select systems in place. Mechanical and plumbing systems were renovated, including the installation of a new sanitary sewer. Electrical and telecommunication systems were replaced, a new foam suppression system was installed, and new interior partitions and doors were erected.
Administrative Area C, Second Floor Work: This phase focused on the second floor of Administrative Area C, involving renovations of interior wall enclosures, installation of new stairs, overhead doors, and rated exterior construction.
Canopy Replacement and Hangar Door Repairs: The project included the demolition and replacement of an exterior canopy, repair of hangar doors, and coating the hangar bay floor with a fuel-resistant coating.
Metal Awnings and Wall Panel Enhancements: New metal awnings were installed at exterior doors, and exterior metal wall panels received a fresh coat of paint. Additionally, a lightning protection system was installed to enhance safety.
Environmental Responsibility and Sustainability:
Beyond the aesthetic transformations, the project prioritized sustainability and environmental responsibility. The incorporation of insulation panels, fuel-resistant coatings, and energy-efficient systems aligns with the modern emphasis on green construction practices, contributing to the overall efficiency and environmental sustainability of DMAFB.
Collaboration and Precision:
Executing a project of this magnitude required seamless collaboration between Marsh Development and the USACE. The precision involved in preserving certain aspects of the existing structure while introducing cutting-edge systems and finishes demonstrates the mastery and dedication of the project team.
Conclusion:
The DMAFB AMU Facility 5251 Renovation and Sustainment project is a testament to the transformative power of thoughtful construction. Marsh Development, in collaboration with the USACE, has not only revitalized the physical spaces within Administrative Areas A and C but has also left an indelible mark on the landscape of DMAFB. This endeavor stands as a beacon of comprehensive construction and sustainment, showcasing how meticulous planning and execution can breathe new life into even the most intricate of facilities, ensuring their relevance and functionality for years to come.
At Marsh Development Inc., we redefine skylines and shape the future with our unwavering commitment to innovation, quality, and sustainability.